At this point I had two parts left for my part of the construction. That was to Wrap the building with TYVEK, a type of moisture proofing paper which is stapled to the outside of the building.
Then put some electric into the building which will be the final two parts of the this story.......... Wrapping the building with TYVEK is not that hard just more time consuming. It only requires two people, a staple gun and a razor knife. Little Jim and I got the building wrapped and stapled on August 28th.